Transmission performance

Nangang 110KV double-circuit transmission line construction project


 

Customer name: Xinjiang Nangang Investment Co., Ltd.

Project name: 110KV double-circuit transmission line construction project of Xinjiang Nangang Investment Co., Ltd.

Time of construction commencement: June 11, 2014

Time of completion: July 12, 2014

Location: Yili, Xinjiang

Project profile: this project starts with the 110KV booster station of Nangang 2×135MW power plant and lasts1.2kmin total. For details, please see the road map. Along this transmission line, the 110KV line between the 110KV booster station and the No.3 pole is double-circuit aerial cable. The lead is LGJ-240/30 aluminium conductor steel reinforced, and the GJ-50 steel strand double ground lead is laid. The 35KV line between the 110KV booster station and the No.3 pole is set up with ZRC-YJV-1*300 aerial cable and steel wire. The 110KV double-circuit line and the 35KV line between No.3 pole and No.5 pole are LGJ-150/20 aerial cable on the same pole, while the 35KV line after No.5 pole is off the pole and the 110KV double-circuit line remains on the pole till the chemical substation.



Close