Auxiliary equipment for 1×12MW waste incineration power generation project of Tianfu Thermoelectric Co., Ltd.


Customer name: Xinjiang Tianfu Thermoelectric Co., Ltd.

Project name: Auxiliary equipment for 1×12MW waste incineration power generation project of Tianfu Thermoelectric Co., Ltd.

Location: Shihezi, Xinjiang

Project profile: this project is an incineration line that can treat 2×500 ton waste per day. The two HRSGs are medium-temperature and medium-pressure 75t/h CFB boilers, and there is a 12MW extraction and condensing turbine matched with a 15MW generator. The project operates no less than 8000 hours every year.